Week of May 21
Station One Renovation and Addition
Old Seating area for kitchen
Old Training Room
Assistant Chiefs Office
Training Room Addition
Rear Storage Building Addition .
Addition to Assistant Chiefs Office and Kitchen Area
Week of May 28
Front of Station, Assistant Chiefs office and officers office addition.
Rear training room addition, concrete floors are in.
Rear training building, this is area that will be used for confined space rescue and SAR training's.
Area in foreground is where storage portion of training building will be.
Week of June 4
Front Assistant Chief and Officer room addition block work complete
Rear training room addition block work in progress
Training/storage building basement, confined space simulator materials in basement.
Trusses for rear training room addition on site
Training/storage building ready for concrete
Concrete work complete
Old Assistant Chiefs office/kitchen area
Kitchen Area
Week of June 11
Concrete hollow core floor in over basement in training building, thinset concrete will be poured over this portion.  Walls being constructed in storage area of building.
Masonry work complete on training room addition. 

Steel bar joists installed in front officers addition
Rear storage/training building nearing rough-in
Interior of rear storage/training building
Roof roughed in on training room addition
Roof is complete, exterior trim and wrap installed
Windows in rear training room addition, sidewalks and curbing installed, roofing completed. 
Rear training addition interior, former block walls removed.
Interior block walls in process of being removed
Block wall removed into new officer room and kitchen seating area addition.
Week of June 18
rough wiring installed in rear storage building
Radio room roughed in
new rear training room facing west.  The roughed in area will be storage and AV/Computer interface area
Old flooring removed and interior doors added to separate public access from station interior
Week of June 25
Drywall rear training room
Confined space fittings for underground simulator
Concrete being poured for rear training building
Overhead ductwork for AC/Heat units roughed in
Drywall work in the new AC's office
Week of July 2
Week of July 9
New Assistant Chiefs office looking toward officers room and radio room.
New west entry door installed.
Interior doors to apparatus bay, view from training room entrance.
Drywall complete in rear training room addition.
Interior doors hung in rear storage building
Siding being installed on rear training building
Kitchen area/Dayroom addition drywall complete, west entry doors installed
Insulated OH ductwork rear training room
Worker insulating OH ductwork in Dayroom area
Radio room finish paint
Rear storage building siding, windows and gutters completed
Finish paint in progress rear training room
Week of July 16
A little dark, but new kitchen countertops installed
New cupboards installed in kitchen hallway
Kitchen ceiling tile grids installed
rear landscaping installed, final grade for grass
Exterior paint started..... weather causing delays
Lights being installed in rear addition
Officers room countertops and shelves installed
Radio room countertop installed, looks much better then the original orange countertop.
Week of July 23
rear training room coffee area Formica installed
Monitors mounted in Chiefs office and officer room
ceiling tile complete in all areas
Mail box area, coat rack and cupboards installed in kitchen area
Ceiling tile completed in kitchen area
Chair rail installed in rear training room
confined space simulator competed in rear training building
Dan Beck and Keith Hebl hard at work installing confined space simulator more pics on SRT page)
Construction crew, John Schanz, Keith Hebl, Dan Beck, and Dave Ebelt
Week of July 30
Finish painting completed
Asphalt repairs made
CATV replaced after numerous splices
Radio room tile installed
All hallways, bathrooms, closets floor tile replaced
Week of August 6
Training building exterior with new grass
Station exterior with new paint
Carpet installed in rear training room
Old "temporary" radio room used for last time
New radio location in the remolded radio room
The "pod" which was used for storage during the project
Firefighters Pickelman and Anderson moving the old furniture in the kitchen addition
Nothing like new carpet to make your furniture look really bad
The filled to capacity kitchen addition, awaiting carpet to be installed in adjacent room.  A major un-named carpet retailer in Saginaw Township:  not enough carpet to finish, great job measuring guys!
Week of August 13